Randy W. Clark
808 West Whitmer Street
Central City, KY 42330
Cell 270-820-5498
Home 270-977-7096
randyclark2014@yahoo.com
In the past thirty plus years I have worked in various construction/manufacturing
facilities including but not limited to: steel mills, refineries, nuclear and fossil fuel power plants,
chemical, water treatment plants and manufacturing plants.
I am accountable for safety; contract evaluation, planning, risk management, cost, quality
control, staffing, equipment, scheduling, change orders, sub contracts and project financial close
out.
I am very experienced in computer hardware and software: IBM, HP and Dell computer
hardware, Microsoft Office (Excel, Power Point, Word), Microsoft Project, QuoteExpress Piping
Estimating, Timberline Estimating, Contractor Manager, AutoCAD, JD Edwards AS400,
Timberline and IBM Platinum accounting Programs.
I am well versed in best practice project management techniques and methodology from
estimating mechanical, steel and equipment setting to financial closure with special attention
given to scheduling, man loading, extras and their corresponding paper trail.
I have always been a team player and can organize a refined team around myself as well
as fit into an established team. I am very articulate, an avid learner, pay attention to details and
cost, thrive in a fast paced work environment and most important I am dependable.
EDUCATION:
University of Southern Illinois, Champaign, IL
Graduated with a Baccalaureate in Business Administration 12/95
GPA 4.0
Colorado Mountain College - Buena Vista & Rifle, CO
Graduated with an Associate in Arts Degree - 6/89
Graduated with an Associate in Science Degree - 12/89
Graduated with Presidents Academic Honors Award, 4.0 GPA every semester
Washburne Trade School - Chicago. IL
Graduated after four year apprenticeship - Journeyman Pipefitter 6/78
Received AFL-CIO Craftsman Award 1978, 1st in class.
Chicago Christian High School - Palos Hills, IL
Graduated with honors after three years - Diploma 1974
SKILLS:
Project Management:
I have the training and knowledge to implement project management standards and
methodologies in all phases of projects, particularly introducing or changing things, in any area
or function.
Computers:
I am very experienced in computer hardware and software: QuoteExpress and Timberline
estimating software, Microsoft Office, IBM Platinum, Timberline and JD Edwards AS 400
Accounting Programs, AutoCAD, Visio, Microsoft Project, Primavera 6 scheduling and
Primavera Contractor.
Certificates:
Kentucky Boiler Contractors License
Manager Awareness Development
Project Management - Mechanical Contractors Association of Chicago
PMP Member
OSHA Safety Management, 10 Hour OSHA & 30 Hour OSHA
START Program (Supervisor Training in Accident Reduction Techniques)
EMPLOYMENT HISTORY:
12/14 – Present Project Manager
Tenaris, Bay City, TX
Project is a seamless pipe mill with a rotary furnace, austinizing furnace and finishing mill with a
600 ton per capacity.
5/14 – 10/14 Construction Manager – Hired on contract
CDMG, Cannonsburg, PA
Coordinated capital expansion project – E-Line Capacity Expansion at Calgon Carbon, Big
Sandy Plant, Catlettsburg, KY. Pre-outage and outage work. Responsible for daily coordination
of three engineers, a scheduler and eight subcontractors, daily engineering questions and RFI’s to
the engineer of record, authorizing extra work and completing with the necessary change orders.
6/11 – 4/14 Construction Manager, Project Engineer/Estimator – Full time employee
Thompson Construction Group, Sumter, SC
Construction Manager/Estimator, Nucor Steel, Darlington, SC – Installation of New
Equipment for Bar & Angle Rolling Mill
Estimated New Steel Mill equipment and piping projects ATI (Allegheny-Ludlum), PA
and Horsehead Zinc chemical extraction project.
Construction Manager / Project Engineer
Horsehead project in Mooresboro, NC. Responsible for purchasing, subcontracts,
subcontractors, daily engineering questions and RFI’s to the engineer of record,
estimating extra work and having it authorized and completed with the necessary change
orders.
7/08 – 4/11 Project Manager - Full time employee
Graycor Industrial Constructors, Oak Brook Terrace, IL
Managed three successful projects and estimated steel mill, refinery and boiler projects in
corporate office between projects:
Nucor Steel, Decatur, AL – Upgrade/rebuild of hot rolled sheet mill
Calgon Carbon, Catlettsburg, KY – Flue PAC Project
Praxair Corporation, Whiting, IN – Installed New Hydrogen Plant including Reformers,
Compressors and associated piping.
Duke Energy, Edwardsport, IN – Centerline Piping, GE Turbines and Steam Turbine
6/07 - 7/08 Construction Manager - Full time employee
Scheck Technical, Countryside, IL
Marathon Refinery, St. Paul Park, MN
Managed the installation of upgraded digital instrumentation.
M 3/07 - 6/07 Construction Manager - Full time employee
Day & Zimmermann NPS
Clinch River Generating Station
Managed three outages and two capital projects that were under budget and on schedule.
4/04 - 2/07 Construction Manager - Full time employee
Stone & Webster, Shaw Group
SCR & FGD Modifications for Mirant
Mid-Atlantic, LLC
o Chalk Point Fossil Fuel Generating Station, Aquasco, MD
o Dickerson Fossil Fuel Generating Station, MD
o Morgan Town Fossil Fuel Generating Station, MD
New Ultra Low Sulfur Diesel Unit
Marathon Refinery, Garyville, LA
New Ultra Low Sulfur Diesel Unit
Conoco / Phillips Refinery, Ponca City, OK
Unit 1 Restart Project
Browns Ferry Nuclear Power Station, Athens, AL
2/03 - 4/04 Construction Manager- Full time employee
Scheck Industries, Countryside, IL
Duck Creek Power Station, Canton, IL
Combined Fuel Upgrade Project
4/00 – 1/03 Senior Construction Manager- Full time employee
Day & Zimmermann NPS
Cumberland Fossil Plant, Cumberland City TN
Cumberland SCR Project – Installed two New SCR Units (built on site)
Installed the seasonal Flue Gas by-pass duct system
1/94 -3/00 Site Construction Manager- Full time employee
Morrison Construction Co.
AK Steel Rockport Works, Rockport, IN
Install New Install Cold Rolling Mill Equipment and associated piping.
AK Steel Rockport Works, Rockport, IN
Install New Continuous Pickling Line Equipment and associated piping.
AK Steel Rockport Works, Rockport, IN
Install New Continuous Galvanizing Line Equipment and associated piping.
Midwest Steel, Portage, IN.
Install New Continuous Galvanizing Line Equipment and associated piping.
Install New Stripper Line
U.S. Steel, Gary, IN
Blast furnace rebuilds and hot strip rolling mill projects
1/90 - 12/93 Project Manager- Full time employee
WesBock Inc., Frankfort, IL
Exxon Mobile
Stephen Chemical
BASF
6/78 - 1/90 Estimator/General Foreman/Foreman/Welder/Pipefitter
Traveled and worked for various companies/local unions across the country and abroad.
8/74 - 6/78 Local Union #597 Steamfitter / Pipefitter Apprenticeship - Chicago. IL
References available upon request.